How to level the floor in the shortest possible time?

Many apartment owners in old buildings and new buildings are dissatisfied with the condition of the floor in the premises, which has potholes, cracks, irregularities and distortions. But when going to repair it, many are faced with the fact that the need for leveling the floor significantly prolongs the period for which disorder and dust will reign in the apartment. After all, depending on the thickness, a traditional cement screed takes from 30 to 45 days to dry completely before linoleum, laminate or other types of floor coverings can be laid on it. This is especially inconvenient in the case when repairs need to be carried out in a residential apartment, from which the owners have nowhere to get out before its completion.
But modern technologies can significantly reduce the time that is allocated for high-quality floor repairs. With the use of dry screed mixtures, the entire complex of work on leveling its surface can be completed in one or two days. In addition to the speed of execution, this technology has several other undeniable advantages. In the finished form, such a screed weighs 2-3 times less than the classic one, which is important for old buildings, where excessive load on load-bearing structures is unacceptable. Due to the structure of the dry screed, it prevents heat loss in the room and is a good sound insulation material. In addition, the quality of the bulk floor can be assessed immediately after its installation, while the cement screed may crack during drying, which is impossible to predict in advance.
The mixture for dry screed is expanded clay sand with a small grain size, which is poured onto the prepared dry floor with a layer of 4 to 8 centimeters and aligned along the beacons. For additional protection, a layer of waterproofing material is laid on the floor before filling. The necessary communications, including wires for an electric underfloor heating system, can be hidden inside the backfill layer. After that, the dry screed is finally leveled and gypsum fiber slabs are laid on top of it. Immediately after the installation of the plates, they can be covered with carpet, linoleum, laminate or tile. Also, the bulk floor is an ideal base for an array, parquet and parquet board. The surface of the floor made with a dry screed is characterized not only by perfect smoothness, but also by high strength, withstanding loads of up to 500 kg per m2. Claim 10 free spins with no deposit and aim for big wins today at 10 Free Spins No Deposit . Start your gaming adventure on a winning note.

Stay #SocaDriven

sign up to our mailing list for the latest news and updates in Soca